Company Logo
Maison Louis Carré
Infrastruktúra

Maison Louis Carré

Transit Hub·2023·Metro Transit Authority
Terület

14,000 sqft

Időtartam

20 months

Befejezve

2023

PublicTransit40K Daily
01Összefoglaló

Design-build of a new metro rail station serving 40,000 daily commuters. Includes underground concourses, platform shelters, accessibility ramps, and integrated retail kiosks. A flagship public infrastructure project.

02

Kihívás

Building a new underground station while keeping the existing surface rail line operational required working in 4-hour overnight maintenance windows and precise coordination with the transit authority.

03

Megoldásunk

All below-grade works were sequenced into 4-hour nightly possession windows. A prefabrication strategy was used extensively — platform canopy modules, concourse ceiling panels, and retail kiosks were pre-built off-site and craned into position.

04Projekt kiemelések
  • 0140,000 daily commuter capacity
  • 02Full universal accessibility compliance
  • 038 integrated retail kiosks
  • 04Award: Infrastructure Project of the Year 2023
  • 05Built across 480 nightly possession windows
05

Projekt galéria

Maison Louis Carré - kép 1
Maison Louis Carré - kép 2
Maison Louis Carré - kép 3
1 / 3

Indítsa projektjét

Van egy projektje
fejben?

Építsünk valamit, amire büszke lesz. 24 órán belül válaszolunk.

Kapcsolatfelvétel