Company Logo
Hearts Castle
Felújítás

Hearts Castle

Westwood·2024·Private Homeowner
Terület

3,400 sqft

Időtartam

4 months

Befejezve

2024

ResidentialFull GutModern
01Összefoglaló

Complete gut renovation of a 1970s family home — new open-plan kitchen, two additional bathrooms, full rewire, and structural wall removal. Transformed into a modern family home while preserving original hardwood floors.

02

Kihívás

A 1970s home with non-compliant original wiring, load-bearing walls in the wrong places, and original hardwood floors the client was determined to preserve presented a complex puzzle.

03

Megoldásunk

We used temporary shoring to allow safe removal of load-bearing walls, installed a new steel beam to carry the upper-floor load, and used orbital sanding and refinishing to bring the original floors back to life.

04Projekt kiemelések
  • 01Original hardwood floors fully restored
  • 02Load-bearing walls removed with steel beam solution
  • 03Two new bathrooms added within existing footprint
  • 04Full rewire to current code with smart home pre-wire
  • 05Open-plan kitchen with island and scullery
05

Projekt galéria

Hearts Castle - kép 1
Hearts Castle - kép 2
1 / 2

Indítsa projektjét

Van egy projektje
fejben?

Építsünk valamit, amire büszke lesz. 24 órán belül válaszolunk.

Kapcsolatfelvétel