Glass House
Infrastruktúra

Glass House

New Canaan·2023·City Infrastructure Authority
Terület

8,200 sqft

Időtartam

8 months

Befejezve

2023

HeritageStructuralCivil
01Összefoglaló

Full structural restoration of the 1940s Central Bridge, including new concrete decking, updated railing systems, and waterproofing. A technically complex heritage project completed with zero traffic disruption.

02

Kihívás

The 1940s bridge required full structural remediation while remaining open to traffic — a constraint that demanded precision staging and round-the-clock coordination with city transport authorities.

03

Megoldásunk

We developed a three-stage lane-closure schedule, working one third of the deck at a time, allowing two lanes of traffic to remain open at all times. Night shifts handled the noisiest concrete breaking work.

04Projekt kiemelések
  • 01Heritage designation maintained throughout
  • 02Zero traffic closures — phased works only
  • 03Full concrete deck replacement and waterproofing
  • 04New stainless-steel heritage-style railings
  • 05100-year design life achieved
05

Projekt galéria

Glass House - kép 1
Glass House - kép 2
1 / 2

Indítsa projektjét

Van egy projektje
fejben?

Építsünk valamit, amire büszke lesz. 24 órán belül válaszolunk.

Kapcsolatfelvétel